Interconnection Studies (Generator, Load)

 

Connecting new load and generator projects to the electrical grid requires planning studies and compliance with ISO requirements.

Studies typically include power flow, dynamics, short circuit, voltage stability, and other studies depending on the application, as well as providing plant models and validation. 

Each jurisdiction has different requirements and processes for connecting a new generator or load, or making changes to existing ones.